Not taken — the garage was chosen. On 30 October 2026 John decided to stay in his garage with two machines. This page stays published for reference; the final layout is on Garage Print Lab.
Option C · 6 McLaren, Suite L · the bigger unit

If he took 6 McLaren, Suite L

John asked what another 300 square feet would buy. This is that unit, and the leasing brochure has a real plan for it, so this page is traced rather than assumed. It publishes at ±1,200 sq ft — which makes the true gain over Suite E about 228 sq ft, not 300.

Layouts A and B were 8 McLaren Suite E. John picked B, everything against the walls. This is Option C: the same perimeter-first idea, in the larger suite. It is meant to be read beside the other two, not instead of them.

One name, two spellings. The brochure calls this Suite L; the request called it unit L, and the page lives at /mclaren-unit-l. Same unit — and note it is 6 McLaren, a different building from Suite E at 8 McLaren.

What the extra floor actually buys

Three things change against the Suite E plan, and only one of them is floor area:

Option C — everything against the walls

Option C — 6 McLaren Suite L, four Mimaki 3DUJ-553 machines against the perimeter Scaled floor plan of 6 McLaren Suite L, a notched rectangle of about 28.1 by 44.6 feet enclosing 1,200 square feet. Four printer envelopes run down the west wall, a reserved metal printer bay sits in the north-east corner, and the wash line sits against the existing restroom wet wall. All three doors and the ground-level door are drawn with their clear zones. 1 2 3 4 5 6 7 8 9 10 11 GL PRINT ROOM — OPTIONAL 331 sq ft of 932 Restroom existing existing lavatory Reception 194 sq ft vest. 28.1 ft 44.6 ft GL 7.65 ft 5.13 3.93 4.51
Suite L at 28.14 × 44.56 ft overall, drawn to the published ±1,200 sq ft. Solid green is each machine’s body; the pale box around it is Mimaki’s service clearance. Blue hatch is a door clear zone, grey hatch is the vestibule, which is circulation and not usable floor. The dashed rectangle is floor reserved for a metal printer, not a machine. No extraction is drawn — see the air section.

The sink question — there is already a sink in this suite

John wrote that he might not need the sink with the cleaning unit I’m looking at. The plan adds something to that: Suite L’s restroom is already plumbed, with a lavatory and a toilet, about 4.5 ft from where the wash line would go. So the real question is not sink-or-cleaning-unit. It is which of three things does which job.

JobExisting restroom lavatoryCleaning unit / ultrasonicDedicated utility sink
Hand washing, small rinseyes — already therenoredundant
A 20×20×12 in partno — a lavatory bowl will not take ityes — this is what it is foryes
Filling and draining the tankpossible but awkward, and it is the restroom—yes, with a drainboard
SW-100 support wasteneverproduces itnever to sewer

What a restroom lavatory can and cannot take. It is a hand-wash fixture on a sanitary branch sized for a hand-wash fixture. Rinse water is fine. Dissolved SW-100, resin, slurry, abrasive or solids are not — not because the drain will block today, but because it puts process waste into the building’s sanitary line, which is the landlord’s problem and then John’s. The wastewater drums stay in the plan whatever he decides about the sink; they are collected and hauled, and nothing about the existing restroom changes that.

So: the dedicated wash sink becomes optional, and the plan draws it that way. If the cleaning unit handles big parts, element 8 can come out and the suite still has a sink — which was not true of the garage. What the existing restroom really buys is not the basin, it is the short tie-in: supply and waste are already at that wall, so adding a utility sink later is a few feet of pipe rather than a new run.

Worth asking the landlord what the restroom waste line will accept before anything is plumbed into it, and worth confirming that a parts-wash fixture is allowed at all.

Enclosure — a print room, or the open warehouse?

John asked whether the machines need an enclosure if this goes into a warehouse. Here is the trade-off, and then the room drawn to scale. Nothing here decides it — both options are live, and one of them costs money the other does not.

The number that drives most of this is Mimaki’s, not mine. The 3DUJ-553 will operate from 59–95°F, but colour and dimensional accuracy are only guaranteed between 68–77°F (20–25°C), with humidity at 35–65 % RH, non-condensing. Those are the same figures the garage page was built on, from the Site Requirements Guide. A warehouse shell is not normally held inside that narrow band; a small room can be.

 Enclosed print roomOpen warehouse placement
Dust and debris A sealed room with a door is the only thing here that actually excludes concrete dust. Matters most at the print head and in open material. Bare warehouse slabs shed fines, and forklift and door traffic keep them airborne. Nothing in the layout stops that.
Climate — holding 68–77°F Conditions 331 sq ft, about 4,632 cu ft at the published 14 ft height. Conditions 932 sq ft / 13,053 cu ft to achieve the same thing — roughly 2.8× the volume, every hour it runs.
Noise Contained, and it is a partition between the machines and the reception rather than the whole suite. Carries across an open shell; the reception is the room that notices.
Fire and code separation Verify with the city. Building a room inside a leased shell is tenant improvement work and can touch occupancy, egress, sprinkler coverage and alarm layout. This page does not rule on any of it. Verify with the city. Fewer constructed elements is not the same as fewer obligations, and the equipment and its materials are identical either way.
Service access The partition lands exactly on Mimaki’s service envelopes, so a technician keeps the clearance — but see the tolerance note below. Unrestricted on every side. This is the option a service engineer would pick.
Security A lockable door around the machines, separate from whoever else holds keys to the suite. Whatever the suite’s own locks give, and nothing more.
Cost Build cost, plus a permit question. None.

The room, drawn

The dashed amber rectangle on the plan above is the print room: 9.40 × 35.20 ft = 331 sq ft, wrapping all four service envelopes, with a 3.0 ft door in its south wall hinged on the east jamb and swinging out into the warehouse. It was sized by the constraints, not by eye:

There is no construction tolerance in the east wall. It lands at x = 9.40 ft, exactly on the service envelopes. Push it even six inches east and the walkway past the shelving drops to about 3.4 ft, below the 3.93 ft this page publishes. If the builder needs those six inches, the shelving (element 10) is what moves — it is the only thing creating that pinch, and it is fit-out. The south wall at y = 35.20 ft is flush to machine 4 the same way.

On ventilation this changes nothing and decides nothing. No extraction is drawn here either. It is honest to say a room makes any future extraction simpler — a contained volume is easier to duct and to balance than an open shell — but that is an argument available later, not a decision taken now, and the equipment positions do not depend on it.

The three doors, measured

Each opening was measured as a gap in a wall run. Which jamb a door hangs on, and which way it swings, came from fitting a circle to the drawn arc and taking its centre as the hinge — not from reading the picture by eye.

 Entry doorWarehouse / receptionRestroom door
In which wallreception south, y = 40.59 ftreception north, y = 26.31 ftrestroom west, x = 19.04 ft
Opening (gap in the wall)19.96 – 22.87 ft → 2.91 ft15.63 – 18.53 ft → 2.91 ft23.10 – 25.95 ft → 2.86 ft
Leaf, from the arc3.06 ft2.96 ft3.01 ft
Hinged onwest jambeast jambsouth jamb
Swingssouth, out of the suitenorth, into the vestibuleeast, into the restroom
Kept clear here5.0 ft approach, reception sidewhole swing, vestibule side4.0 ft approach, vestibule side

The same two doors crowd each other here as at Suite E, and again it is the building, not the layout. The restroom jamb and the reception door hinge are 0.62 ft apart. The reception door standing fully open lies across the approach to the restroom door. Both work; both at once is awkward, and no arrangement of equipment fixes it. That is why the whole vestibule is held clear and nothing is drawn in it.

The clear zones drawn are the generous reading: 5.0 ft on the pull side of the entry door, 4.0 ft on the push side of the restroom door, and the reception door’s whole swing. What actually applies to a suite this size is the building department’s call, not mine.

The clear walkway, dimensioned

There is one continuous walkway from the ground-level door to both exits. It never narrows below 3.93 ft:

WhereBetweenClear width
Beside the machine columnx 9.40 → 14.53 ft5.13 ft
Past the shelving — the narrowest pointx 9.40 → 13.33 ft3.93 ft
Across the vestibule to the reception doorx 14.53 → 19.04 ft4.51 ft
Ground-level door landingx 1.80 → 14.53 ft12.73 ft
North bay, across the topx 9.40 → 19.04 ft9.64 ft

The 3.93 ft pinch is caused by the shelving, which is fit-out. Move the shelving and it goes back to 5.13 ft. Nothing structural creates it.

Clearance check

Every element above, tested against every door clear zone: 0 blockages. Also tested: no element overlaps another (0 found), and no element is drawn outside the warehouse — in the restroom, the reception, or past an outside wall (0 found). The test is rectangle intersection on the same coordinates the drawing is made from, so the drawing cannot disagree with this result.

Zone held clearExtentAreaResult
Ground-level door landing, 5.0 ft deepx 3.49–11.14, y 39.56–44.5638.2 sq ftclear
Entry door approach, reception side, 5.0 ftx 19.96–22.87, y 35.59–40.5914.5 sq ftclear
Warehouse / reception door swingx 15.58–18.53, y 23.35–26.318.7 sq ftclear
Restroom door approach, vestibule side, 4.0 ftx 15.04–19.04, y 23.10–25.9511.4 sq ftclear
Vestibule — kept wholly clear, it serves two doorsx 14.53–19.04, y 18.25–26.3136.4 sq ftclear
Print-room door swing, warehouse sidex 5.00–8.00, y 35.20–38.209.0 sq ftclear

A clean result here means nothing is drawn where a door needs to move. It does not mean the clear zones are the right ones — those are the generous reading described above, not a code citation.

Key elements, dimensioned

#ElementFootprint, ftAreaWhy it sits there
1Mimaki 3DUJ-553 — machine 19.40 × 8.8082.7 sq ftNorth-west corner. Body is 7.42 × 4.92 ft; the rectangle drawn is Mimaki’s service envelope.
2Mimaki 3DUJ-553 — machine 29.40 × 8.8082.7 sq ftSecond in the west column. The column runs down the longest wall in the suite.
3Mimaki 3DUJ-553 — machine 39.40 × 8.8082.7 sq ftCrosses the line where the north bay becomes the west leg — no wall there, so nothing to clear.
4Mimaki 3DUJ-553 — machine 49.40 × 8.8082.7 sq ftLast one in, and the furthest south. Stops well clear of the ground-level door.
5Metal printer bay, RESERVED9.00 × 8.0072.0 sq ftHeld empty against the north and east walls. No model named, so this is floor set aside, not a design.
6Wastewater drums, 2-drum spill pallet4.25 × 2.179.2 sq ftNorth of the wash line and reachable without crossing it. SW-100 cannot go to sewer — these are collected and hauled.
7Three-tank ultrasonic5.50 × 3.0016.5 sq ftAgainst the restroom’s wet wall. Takes the 20×20×12 in part John quoted.
8Utility sink + drainboard3.00 × 2.507.5 sq ftAlso on the wet wall, a few feet from the restroom’s existing supply and waste. Optional — see the sink section.
9Workbench1.80 × 8.0014.4 sq ftWest wall, south of the machine column. Kept shallow so it stays out of the door landing.
10Shelving / material storage1.20 × 10.0012.0 sq ftAgainst the reception wall. This is the one thing that narrows the main walkway, and it is why the walkway measures 3.93 ft.
11Electrical sub-panel0.60 × 2.30—Position proposed. The existing service location is not shown on the brochure.
 Everything above—463.9 sq ftOf 932.4 sq ft of warehouse. Leaves 468.5 sq ft to move in.

Power

The brochure lists 100 Amps, 120–208V, 3 Phase under the property highlights, and adds its own (verify). At 100 A and 208 V three-phase that is about 36,027 VA. Nothing about the larger suite changes this table — it is the same four machines.

LoadQtyWatts eachWattsOf service
Mimaki 3DUJ-55341,630 6,52018.1%
Ultrasonic support removal, heated1 ~1,5001,500—
Bench, lighting, small tools— ~1,0001,000—
Printing and finishing   9,020 25.0%
Extraction — only if the filter option is taken 2~370740 —
With extraction   9,760 27.1%

Headroom is not the constraint here. The figures for anything other than the printers are estimates and should be replaced with the nameplate of whatever is actually bought — and the service itself still needs the verification the brochure asks for. A reserved metal printer is not in this table at all, because no model has been named.

Air — still open on this plan

No decision is made here and no extraction is drawn. The garage page shows one option; whether this suite gets filtration units beside the machines, a ducted extract, or something that uses the 14 ft height, is still open. It changes the power line above by about 740 W and nothing else on this layout — the equipment positions do not depend on it.

Post-processing and waste

From John’s own list, and unchanged by the bigger suite except in where it sits:

Getting a crate in, and in what order

A crated 3DUJ-553 is 5.9 ft across its narrow face.

Measure the ground-level door before ordering anything. 7.65 ft against a 5.9 ft crate is comfortable — but that figure is scaled off a leasing brochure that carries no door dimension at all. A door symbol on a brochure is drawn to look right, not to be measured. Clear width and clear height, on site, with a tape.

What is published, and what I scaled

Only a handful of numbers here come from the landlord. Everything else is measured off the drawing, and is labelled as such.

Published by the brochureScaled off the drawing by me
±1,200 SF (6 McLaren, Suite L) every wall, room and door position
14 ft minimum clear height 28.14 × 44.56 ft overall
ground-level doors ground-level door 7.65 ft wide
100 A, 120–208 V, 3 phase (verify) all three interior openings, swings and leaf lengths

The one check worth reporting. The scale was set so the suite outline closes on the published area, so that it closes proves nothing. What does mean something: the three door leaves were not used to set the scale, and they fall out at 3.06, 2.96 and 3.01 ft — three ordinary 3 ft doors. A wrong scale would have to be wrong by the same factor in a quantity it never saw. Drawn from the measured walls the suite comes out at 1200.0 sq ft: warehouse 932.4, restroom 73.3, reception 194.3.

The three property figures above are listed for the whole of Irvine Business Center — several suites across several buildings — not for Suite L specifically. The brochure also states plainly that nothing in it is an offer or a warranty.

Suite E and Suite L, side by side

 8 McLaren Suite E6 McLaren Suite L
Published area±972 SF±1,200 SF
Machines4, two across two deep4, one column on the long wall
Reserved metal bay38.8 sq ft72.0 sq ft
Free floor after fit-out351.6 sq ft468.5 sq ft
Ground-level door, scaled6.4 ft7.65 ft
Crate ordereast column first, aisle is narrower than the cratenorth first; no crate passes a placed machine
Existing sink in the suiterestroom, a few feet awayrestroom lavatory, drawn
Reception / office140.0 sq ft194.3 sq ft
Costrent, ongoingrent, ongoing — and more of it

The extra 228 sq ft is real but it is not the reason to prefer this one. The reasons are the single wall long enough to take all four machines in a row, the wider ground-level door, and a restroom that is already plumbed next to where the wash line goes.

Before signing anything

Related

← Kindro