Program
- floor
- L2 of 5
- floorplate
- 15 m × 30 m = 450 m²
- units
- 6 holiday rentals
- circulation
- H-corridor: N strip + S strip + core-link, 1.0 m wide
- cores
- fixed: W stair (egress W) · elevator (door W) · E stair (egress E)
- frontage
- 15 m south, 3 roll-ups (L1 retail/light-ind)
- zoning
- industrial / mixed-use
Area budget
| zone | m² | % |
|---|---|---|
| units (net) | ~320 | 71% |
| corridors (H-system) | ~42 | 9% |
| W stair (fixed) | 15 | 3% |
| elevator (fixed) | 7.5 | 2% |
| E stair (fixed) | 15 | 3% |
| walls / buffer | ~50 | 12% |
| total | 450 | 100% |
Floor 2 — layout (6 units, fixed cores)
Works around fixed existing cores: W stair (egress west), industrial elevator (door west), E stair (egress east), all sharing a central band at y=13–18 m. Two small north studios + two mid-north flats + two large south suites. H-corridor gives every unit access to both stairs (CN code 2-exit requirement) and the elevator. All wet walls stack on the central N-S spine for drainage alignment.
Unit schedule
| unit | size (m) | area | type |
|---|---|---|---|
| 1 (NW) | 7.25 × 5.0 | 36 m² | studio · N+W light |
| 2 (NE) | 7.25 × 5.0 | 36 m² | studio · N+E light |
| 3 (mid-W) | 7.25 × 7.0 | 51 m² | 1-BR · W gap light |
| 4 (mid-E) | 7.25 × 7.0 | 51 m² | 1-BR · E gap light |
| 5 (SW) | 7.5 × 11.0 | 82 m² | 2-BR suite · S+W light |
| 6 (SE) | 7.5 × 11.0 | 82 m² | 2-BR suite · S+E light |
Site
Drainage
Open questions
- Confirm L1 use under units (noise/odor → kitchen stack routing).
- Fixed cores verified against structural drawings? W stair, elevator, E stair cannot shift.
- Industrial elevator capacity — is a passenger cab needed separately for holiday guests?
- Mid-units (3 & 4) are single-aspect (gap light only); consider skylights or light wells.
- Large south suites (5 & 6) at 82 m² — split into 4 smaller units for higher yield?